
This task order was to repair an existing 39,000sf metal roof system and apply a new fluid-applied elastomeric high-build urethane coating onto the hanger’s 40+ ft high metal roof assembly. The project also included repairing a portion of fencing and gate.
(more…)
Full Description »Download PDF »

This project consisted of designing and building four four-bedroom Junior Noncommissioned Officer (JNCO) housing units on approximately one-half acre of land and one four-bedroom Garrison Commander’s (GC) residence on approximately six-tenths of an acre of land at Fort Hunter Liggett, California. This housing project is required to meet LEED-Silver and Energy Star requirements.
(more…)
Full Description »Download PDF »

The original scope of work included removing and replacing 4,992 of the World War II wood single pane windows in the 4000 and 5000 area barracks buildings of Camp Roberts. This work included lead and asbestos abatement during the removal process. Energy-efficient, double-pane vinyl framed windows replaced the old windows.
(more…)
Full Description »Download PDF »

This project replaced the existing point of entry switch building; multi-mode fiber communication lines and switches; and the existing 6” steel gas main along Arizona Blvd. at Camp Roberts, California. (more…)
Full Description »Download PDF »