Grizzly Youth Challenge Expansion Project

Camp San Luis Obispo, CA

Download PDF »

This project consisted of building two (2) 3000 sq. ft. classroom buildings, for a total of five (5) classrooms and one (1) 2600 sq. ft. administrative building for the Grizzly Youth Academy students and teachers. Along with building the state of the art classrooms and admin building; there were full site improvements including all utilities, (septic, water, gas, electric and comm) and expanding the parking lot. The high voltage work included installing a new transformer. This was a United States Army Corps of Engineers Los Angeles District $3.8 million dollar project. backside of admin bldg backside of classroom 1 20141218_103217_resized